Wisconsin Southern Progress

The first part of my layout that I started with was the WSOR northern sub. There were a few reasons for this not least that I could get it started whilst I waited for materials for the waukesha sub and that it was small enough to get up and running quickly.

So far deck 1&2 have track installed and are operating ready for the final deck and scenery to commence.

The lower deck is Oshkosh WI with the yard on the left and then the industrial areas going away from that point to the end of the lower level.

The other visible deck is the middle deck and represents Fisk WI and Pickett WI between Oshkosh and Ripon.

The final deck above what can be seen today will represent Horicon Yard the divison point for the Northern WSOR Division. Trains here will be made up to serve the Oshkosh sub and also to run onto the Waukesha Sub Divison part of the layout to serve places south. There is room to add the Markesan Sub Divison at a later date above the Horicon Yard making this part of the layout 4 decks.

Leave a comment